全國(guó)服務(wù)熱線
13503801616
新聞資訊
News
YD多速電機(jī)如何接線
YD多速電機(jī)如何接線。、電動(dòng)機(jī)Y/Y2/Y3/YE3系列電動(dòng)機(jī)的繞組引出線為6根。YD/YZD/YDT系列雙速、三速及四速電動(dòng)機(jī)根據(jù)不同繞組有可能為6/9/12根。
1. There are 6 lead-out wires of the motor windings for Y/Y2/Y3/YE3 series. The number of the lead-out
wires for the motor windings could be 6/9/12 depending on different windings types, for YD/YZD/YDT series
two-speed, three-speed and four-speed motors.
2、電動(dòng)機(jī)的旋轉(zhuǎn)方向從軸伸端視為順時(shí)針方向,任意對(duì)調(diào)三相電源線中的兩根,電動(dòng)機(jī)可改變轉(zhuǎn)向。
2. The rotation direction of the motor is clockwise (viewed from shaft extension end). Any swap between
two of the three-phase power lines can change the motor steering.
3、按照接線圖接好電源線(YD/YZD/YDT系列電動(dòng)機(jī)要按照接線圖要求連接好引出線)。外接額定電壓進(jìn)行電動(dòng)機(jī)空載試驗(yàn)。
注意:大極比S3(周期)工作制電動(dòng)機(jī)空載試驗(yàn)時(shí)間不宜過長(zhǎng),觀察電動(dòng)機(jī)是否有異?,F(xiàn)象,否則應(yīng)迅速斷電檢查。
3. Connect the power lines in accordance with the wiring diagram(the lead-out wires of the YD / YZD / YDT
series motor should be connected in accordance with its wiring diagramm). Power the motor with rating
voltage the test it with no-load at first.
Note: For motors with S3 operating system, the no-load test should not last too long. Observing are there any abnormal phenomenas, otherwise you should cut off the power supply immediately and check the system.
返回頂部